Correspondence

Full details of auction parameters and interconnector de-rating factors

Published 15 July 2025

Table 1: Auction parametersÌýÌý

T-1 Auction for delivery in 2026/27 T-4 Auction for delivery in 2029/30
Auction target capacity 5.8 GW 39.1 GW
Demand curve: minimum capacity at price cap 4.8 GW 37.6 GW
Demand curve: maximum capacity at £0 6.8 GW 40.6 GW
Reliability Standard 3 hours LOLE 3 hours LOLE
Net CONE £49/kW/yr £49/kW/yr
Price Cap £75/kW/yr £75/kW/yr
Price Taker Threshold £25/kW/yr £25/kW/yr
15-year agreement threshold N/A[footnote 1] £350/kW[footnote 2]
9-year agreement threshold (for eligible Declared Low Carbon CMUs only) N/A[footnote 1] £205/kW[footnote 3]
3-year agreement threshold (for non-Three Year Zero Capex Threshold CMUs) N/A[footnote 1] £65/kW[footnote 4]
3-year agreement zero threshold (for eligible Three Year Zero Capex Threshold CMUs only)[footnote 5] N/A[footnote 1] £0/kW
Indexation N/A[footnote 1] 2024/25

Table 2: Interconnector de-rating factors (DRF)

T-1 auction forÌýthe 2026/27Ìýdelivery year[footnote 6] T-1 auction forÌýthe 2026/27Ìýdelivery year[footnote 6] T-4 auction forÌýthe 2029/30 delivery year T-4 auction forÌýthe 2029/30 delivery year
Interconnector Connection capacity (GW) NESO range (%) DRF (%) NESO range (%) DRF (%)
±õ¹ó´¡â€¯(¹ó°ù²¹²Ô³¦±ð) 2 - - 54-92 62
±õ¹ó´¡2 (¹ó°ù²¹²Ô³¦±ð) 1.1 - - 54-92 64
·¡±ô±ð³¦³¢¾±²Ô°ì (¹ó°ù²¹²Ô³¦±ð) 1 - - 54-92 68
µþ°ù¾±³Ù±·±ð»å (±·±ð³Ù³ó±ð°ù±ô²¹²Ô»å²õ) 1.2 - - 46-90 67
Moyle (Northern Ireland) 0.5 - - 7-85 60
EWIC (Republic of Ireland) 0.5 - - 7-85 60
Greenlink (Republic of Ireland) 0.5 - - 7-85 60
±·±ð³¾´Ç³¢¾±²Ô°ì (µþ±ð±ô²µ¾±³Ü³¾) 1 - - 54-92 68
±·³§³¢â€¯(±·´Ç°ù·É²¹²â) 1.4 - - 51-89 70
³Õ¾±°ì¾±²Ô²µ³¢¾±²Ô°ì (¶Ù±ð²Ô³¾²¹°ù°ì) 1.4 - - 32-86 63
Neuconnect (Germany) 1.4 - - 40-88 63
  1. Multi-year agreements are not awarded in the T-1 auction.Ìý↩Ìý↩2Ìý↩3Ìý↩4Ìý↩5

  2. The 15-year agreement threshold is adjusted from the previous T-4 value (for the 2028/29 Delivery Year) for inflation, indexed to the 2024/25 inflation level, and rounded to the nearest £5.Ìý↩

  3. The 9-year agreement threshold has been introduced for the upcoming auctions, as described in the Phase 2 response update. The threshold is set as the midpoint between the 3-year (for non-Three Year Zero Capex Threshold CMUs) and 15-year agreement thresholds, rounded to the nearest £5.Ìý↩

  4. The 3-year agreement threshold (for non-Three Year Zero Capex Threshold CMUs)Ìýwas decreased to £65/kW to facilitate lifetime extensions as described in this consultation response.Ìý↩

  5. As defined in Rule 1.2 of the Capacity Market Rules, as described in the Phase 2 response update.Ìý↩

  6. For the T-1 auction, all interconnectors expected to be operational for 2026/27 already hold capacity agreements for the 2026/27 delivery year.Ìý↩Ìý↩2